| |
|
| Contract: |
Vendor Park, Dagenham |
|
Client: |
Ford Motor Company |
|
Contract Period: |
12 Weeks |
Contract description
The Redevelopment of the Existing 5400m2 Vendor Park:-
Incorporating a cut and fill excavation of the over site with the removal of hard spots, kerbing with a gully pot drainage system connecting into a existing refurbished storm water interceptor, repair of a existing fire main, formation of concrete landing leg strips, new machine laid tarmac surface, thermoplastic lining and installation of Armco barriers.
< Back to commercial
|
|