| |
|
| Contract: |
Mobile Trailer Park, Dagenham |
|
Client: |
Ford Motor Company |
|
Contract Period |
8 Weeks |
Contract description:
The Redevelopment of the Existing 2050m2 Main Office Block Ground Floor Slab:-
Incorporating existing reinforced concrete slab repairs, kerb and block paving repairs, sand cement render and painting of walls, reinforced concrete entrance and exit ramps, fibre mesh concrete over slab, thermoplastic lining, timber lorry stops, installation of Armco barriers, tarmac surfacing to existing approach roads.
< Back to commercial
|
|